All case studies

Launching a real-time operations platform for a national rail network (in 6 weeks)

Launching a real-time operations platform for a national rail network (in 6 weeks)

Role

Senior Product Designer at Pego

Senior Product Designer at Pego

Senior Product Designer at Pego

Responsibilities

Strategy, UI/UX, Prototyping, Testing

Strategy, UI/UX, Prototyping, Testing

Strategy, UI/UX, Prototyping, Testing

Date

November 2025

November 2025

November 2025

Overview

Pego is a UK-based startup which streamlines facilities management by connecting buildings, occupants, and operatives through a unified task management platform.

Pego was built for buildings. But one day, a large rail operator asked a bold question:

“Could your platform work for trains?”

They needed a way to manage in-transit and turnaround cleaning across an entire rail network - tracking operatives as they boarded and exited trains, reporting maintenance and cleanliness issues and giving the end client real visibility into network-wide performance.

Unlike buildings, trains and operatives are on the move. Constantly. And we had six weeks to deliver an MVP...

Pego is a UK-based startup which streamlines facilities management by connecting buildings, occupants, and operatives through a unified task management platform.

Pego was built for buildings. But one day, a large rail operator asked a bold question:

“Could your platform work for trains?”

They needed a way to manage in-transit and turnaround cleaning across an entire rail network - tracking operatives as they boarded and exited trains, reporting maintenance and cleanliness issues and giving the end client real visibility into network-wide performance.

Unlike buildings, trains and operatives are on the move. Constantly. And we had six weeks to deliver an MVP...

My role

As the Senior Product Designer, I mentored a junior designer and worked end-to-end across:

As the Senior Product Designer, I mentored a junior designer and worked end-to-end across:

Discovery & research with mobile operatives and rail network managers

Discovery & research with mobile operatives and rail network managers

Concept and system design for a moving, real-time environment

Concept and system design for a moving, real-time environment

UX/UI design for both a live operational dashboard and a mobile operative app

UX/UI design for both a live operational dashboard and a mobile operative app

Rapid prototyping and delivery alongside Product and Engineering

Rapid prototyping and delivery alongside Product and Engineering

Discovery

Key insights emerged quickly:

Key insights emerged quickly:

Operative tasks couldn’t be pre-assigned in advance, work needed to be on-demand

Operative tasks couldn’t be pre-assigned in advance, work needed to be on-demand

Location awareness was critical: Which train? Which station? Which operative?

Location awareness was critical: Which train? Which station? Which operative?

Visibility across the network was fragmented and reactive

Visibility across the network was fragmented and reactive

The system needed to work in real time, at national scale and be usable by non-technical operatives.

The system needed to work in real time, at national scale and be usable by non-technical operatives.

We flipped the building model on its head. Instead of assigning tasks in advance, we designed a system where:

We flipped the building model on its head. Instead of assigning tasks in advance, we designed a system where:

Trains generate work, not schedules

Trains generate work, not schedules

QR codes become entry and exit points

QR codes become entry and exit points

Location data drives task creation, assignment and reporting

Location data drives task creation, assignment and reporting

The solution

Live network dashboard

I designed and prototyped a real-time operational dashboard featuring:

I designed and prototyped a real-time operational dashboard featuring:

A live map of the UK showing every train in the network

A live map of the UK showing every train in the network

Status indicators for:

  • Train location

  • Active operatives onboard

  • Reported issues

  • Delays and cancellations (via live train data)

Status indicators for:

  • Train location

  • Active operatives onboard

  • Reported issues

  • Delays and cancellations (via live train data)

Live and historical locations of cleaning operatives across the trains in the network

Live and historical locations of cleaning operatives across the trains in the network

On-demand operative workflow

For operatives, the mobile app experience was redesigned entirely:

For operatives, the mobile app experience was redesigned entirely:

Activating the phone camera, the app detects QR codes automatically, removing friction and speeding up turnaround times

Activating the phone camera, the app detects QR codes automatically, removing friction and speeding up turnaround times

Scanning a QR code onboard a train automatically checks them in

Scanning a QR code onboard a train automatically checks them in

Tasks are generated dynamically and assigned in real time

Tasks are generated dynamically and assigned in real time

Operatives can:

  • Complete or dismiss tasks as not needed

  • Capture photos for proof and issue reporting

Operatives can:

  • Complete or dismiss tasks as not needed

  • Capture photos for proof and issue reporting

Scanning a QR code when exiting a train updates the network status map in real time

Scanning a QR code when exiting a train updates the network status map in real time

Impact

The result was a step-change in how the network operated:

The result was a step-change in how the network operated:

True real-time visibility across trains, operatives and issues

True real-time visibility across trains, operatives and issues

Faster turnaround cleaning driven by on-demand task allocation

Faster turnaround cleaning driven by on-demand task allocation

Clear, trustworthy reporting for the end client

Clear, trustworthy reporting for the end client

A live operational dashboard the rail operator described as:

“Clearer and easier to follow than any operational dashboard we’ve used before.”

A live operational dashboard the rail operator described as:

“Clearer and easier to follow than any operational dashboard we’ve used before.”

Beyond solving the immediate problem, the project proved something bigger: Pego could scale beyond buildings into high-complexity, mobile environments - opening up entirely new markets.

All delivered as a working live MVP in six weeks.

Beyond solving the immediate problem, the project proved something bigger: Pego could scale beyond buildings into high-complexity, mobile environments - opening up entirely new markets.

All delivered as a working live MVP in six weeks.

What I'm most proud of

Translating a moving, real-world system into a simple, usable experience

Translating a moving, real-world system into a simple, usable experience

Designing under extreme time constraints without sacrificing clarity or usability

Designing under extreme time constraints without sacrificing clarity or usability

Using research and systems thinking to unlock a new product direction

Using research and systems thinking to unlock a new product direction